€33 800 Net Price
VERY HIGH PRICE
Construction year
2013
Gross weight
3,500 kg
Mileage
37,617 km
Price upon request
Construction year
2016
Mileage
20,369 km
SERVICES
  • Online consulting
  • Online contract
  • Delivery possible
  • Reservation
  • Outside regular office hours
€24 500 Net Price
NO PRICE RATING
Construction year
2012
Mileage
174,907 km

Aerial platform trucks

Auction
Construction year
2011
Price upon request
Construction year
2020
Filters (4) Close Reset

Filter list

Sort by

Best match
Back Close
Sort by

Make, model, version

Renault
Back Close

Price rating

Back Close
Price rating

Location

Back Close

Net Price

Back Close
Net Price

Transmission

Back Close
Transmission

Advert type

Back Close
Advert type
Overview

Year

Back Close
Year

Mileage(km)

Back Close
Mileage(km)

Condition

Back Close
Condition

Color

Back Close
Color

Hours Run(h)

Back Close
Hours Run(h)
Technical specs

Gross Weight(kg)

Back Close
Gross Weight(kg)

Height(m)

Back Close
Height(m)

Loader Crane Lifting Height(m)

Back Close
Loader Crane Lifting Height(m)
Engine and Transmission

Emission Level

Back Close
Emission Level

Engine Power(hp)

Back Close
Engine Power(hp)
Options

Exterior

Back Close
Exterior
Dimensions

Axle Configuration

Back Close
Axle Configuration

Suspension Type

Back Close
Suspension Type

Wheelbase(cm)

Back Close
Wheelbase(cm)

Max. Payload(kg)

Back Close
Max. Payload(kg)

Maximum Lift Height(m)

Back Close
Maximum Lift Height(m)

Max Lift Capacity(kg)

Back Close
Max Lift Capacity(kg)

We could not find any items matching your search query

Reset filters

Latest industry news

Big contract from Linde for the Baumann heavy haulage company Goldhofer THP/SL-L heavy duty modules at work non-stop

Could it be a record operation? Linde Engineering in Tacherting, Bavaria, hired the services of the Baumann heavy haulage company to transport two gigantic heat exchangers,... - Fri, 06 Nov 2020 08:42:00 CEST

Hareket handles the heaviest load in the company’s history

Hareket Heavy Lifting & Project Transportation won the contract to move two 6,200 t passenger ships over a distance of 250 m to a floating dock at the Tersan Shipyard. - Mon, 26 Oct 2020 12:17:00 CEST

thyssenkrupp Marine Systems relies on SPMTs from SCHEUERLE: High availability the decisive factor in purchasing decision

thyssenkrupp Marine Systems won over by high vehicle availability, exceptional service capability and high-quality transport solutions. - Fri, 16 Oct 2020 08:23:00 CEST